Painter
Service Price For 8 Hours
₺980The House Painting Application is provided by the painters at 100% Years.
How Many Days Does House Painting Application Take?
Paint and whitewash application takes an average of 5 days if there is no gypsum plaster renovation on the walls. Factors such as the intensity of the gypsum plaster application to be made on the walls of the house, whether the house is furnished or unfurnished, and the chosen paint color are the factors affecting the painting process.
Paint and whitewash application takes an average of 5 days if there is no gypsum plaster renovation on the walls. Factors such as the intensity of the gypsum plaster application to be made on the walls of the house, whether the house is furnished or unfurnished, and the chosen paint color are the factors affecting the painting process.
What Should Be Considered Before Making a House Painting Application?
If the house is furnished, the items should be removed from the wall (removal of the items should be done under the control of the owner or the owner of the house). For this, first of all, the tops of the skirting boards should be taped, electrical parts such as sockets and switches should be either dismantled or taped, if any, the air conditioner should be packaged and the edges should be taped, the edges of windows and doors should be taped and packed if necessary, if the ceilings are to be painted, the floor should be packed completely, if the ceilings are not to be painted, only a minimum of 1 in front of the walls where the paint is applied. meters, packaging nylon or protective cardboard should be laid.
What Should Be Considered When Choosing Wall Paint?If the house is furnished, the items should be removed from the wall (removal of the items should be done under the control of the owner or the owner of the house). For this, first of all, the tops of the skirting boards should be taped, electrical parts such as sockets and switches should be either dismantled or taped, if any, the air conditioner should be packaged and the edges should be taped, the edges of windows and doors should be taped and packed if necessary, if the ceilings are to be painted, the floor should be packed completely, if the ceilings are not to be painted, only a minimum of 1 in front of the walls where the paint is applied. meters, packaging nylon or protective cardboard should be laid.
While choosing paint, it should not be forgotten that the most important factor is the current condition of the walls, as well as brightness, opacity, the ability of the paint to be wiped, the drying time of the paint, the coverage of the paint, the pigment quality of the paint and, of course, the cost of the paint are important factors in the selection of paint. If the plaster of your walls is not good and there are mistakes on your walls in general, you should definitely prefer a matte paint. If the plaster of your walls is good and smooth, you can choose glossy paint.
In order to get a good appearance on the walls, the walls should be smoothed, the damaged areas should be smoothed with gypsum plaster and sanded. Before paint application, a paint primer should be applied to the walls beforehand.
No comments yet