Paver
Service Price For 8 Hours
₺980It is a daily fee for a tiler for a Tile/Ceramic flooring service.
The service is provided between 9:30 in the morning and 17:30 in the evening.
How to Lay Tiles?
Since tiles are a building material that breaks easily, it should be applied by a tile master. Tile flooring application may vary according to the structure of the wall and floor to be applied. If the tile is to be applied to the wall, it may be necessary to apply a tile transition primer. If the plumbing is broken on the bathroom and WC floors, after the necessary arrangements are made, it is important to apply liquid insulation with mesh before laying the tiles.
Since tiles are a building material that breaks easily, it should be applied by a tile master. Tile flooring application may vary according to the structure of the wall and floor to be applied. If the tile is to be applied to the wall, it may be necessary to apply a tile transition primer. If the plumbing is broken on the bathroom and WC floors, after the necessary arrangements are made, it is important to apply liquid insulation with mesh before laying the tiles.
Materials Required for Laying Tiles
- Tiles: It is a surface coating material that has various dimensions and has a different surface structure according to the application area, cooked and glazed on one side.
- Tile Adhesive Mortar: It is a cement-based mortar that adheres the tile to the surface, which should be chosen in accordance with the structure and color of the selected tile. One bag is 25kg.
- Troho: It is a tile application material with different types such as Mortar trowel (one side is like a comb), Joint trowel (has a rubber surface) and Sponge trowel (has a sponge structure).
- Joint Filler It is the material applied between the ceramics, which is preferred according to the color of the selected ceramic.
- Tile Wedges or Joint Plus: It is the material used to adjust the gap between tiles and to obtain a flatter surface.
- Tile Cutting Machine: It is the material required to cut tiles in required dimensions.
- Measuring ToolsNecessary measurement tools and devices for application
Preparation Before Laying Tile?
If there are tiles in the area to be tiled, it is possible to apply on existing tiles or tiles. If the existing tile is to be removed, this should be done carefully and then the necessary areas should be corrected. If the existing tile will not be broken, tile transition primer should be applied and tile application should be started. The tile laying point should be determined according to the tile size and application area.
If there are tiles in the area to be tiled, it is possible to apply on existing tiles or tiles. If the existing tile is to be removed, this should be done carefully and then the necessary areas should be corrected. If the existing tile will not be broken, tile transition primer should be applied and tile application should be started. The tile laying point should be determined according to the tile size and application area.
Tile Laying Process
The tile application process may differ according to the method used by the applicator. In general, mortar is applied to the floor and the back of the tile, which is ready for tile application, and the condition of the tile is adjusted by the joint plus or wedge. After the application is completed, it is left to dry.
The tile application process may differ according to the method used by the applicator. In general, mortar is applied to the floor and the back of the tile, which is ready for tile application, and the condition of the tile is adjusted by the joint plus or wedge. After the application is completed, it is left to dry.
Joint Filler Application
After the tile application is finished, after waiting for 1-2 days for the used tile adhesive mortar to dry, joint filling is done so that all joints are filled. After the joint filling is done, it should not be stepped on for a few days and no assembly process should be done for the fusion and drying process of the materials.
After the tile application is finished, after waiting for 1-2 days for the used tile adhesive mortar to dry, joint filling is done so that all joints are filled. After the joint filling is done, it should not be stepped on for a few days and no assembly process should be done for the fusion and drying process of the materials.